Skip to main content
MS Floors & Cleaning logo

Flooring Installation Greater Orlando, FL

Carpet Removal & Subfloor Prep in Orlando, FL

Old carpet, tack strips and staples removed, then the subfloor leveled and prepped for hardwood, vinyl plank or laminate.

  • Fully insured (liability)
  • Floors and cleaning, one team

Or call (407) 928-5710

Request an Estimate

Instant confirmation, no spam. We only use your info to send your estimate.

  • Fully insured (liability)

The short answer

What does carpet removal & subfloor prep include?

Carpet removal and subfloor prep means pulling up old carpet and pad, removing tack strips and staples from the subfloor, then checking the surface underneath for flatness and moisture before new flooring goes down. On a concrete slab, the most common fix is self-leveling compound poured into low spots and screeded smooth. Skipping this step is the single biggest reason a new floor ends up uneven or loose after installation.

Every flooring job in a home that currently has carpet starts the same way: the carpet and pad come out, and what is left underneath gets inspected before anyone talks about the new floor. In Central Florida, that subfloor is almost always a concrete slab, and slabs are rarely flat after years of settling, foot traffic and small cracks forming along expansion joints.

MS Floors & Cleaning handles carpet removal and subfloor prep as its own service, whether it is the first step of a larger hardwood, vinyl plank or laminate installation, or a standalone job to get a room ready for someone else's flooring, a rental turnover, or a renovation that is still in progress.

This is also the step most likely to get rushed on a budget job, because it does not show once the new floor is down. A flat, clean, dry subfloor is the difference between a floor that stays tight at the seams for years and one that starts flexing, gapping or creaking within the first year.

Self-leveling compound poured and screeded over a concrete subfloor before new flooring installation

Real work from the MS Floors & Cleaning team.

What is included

Carpet Removal & Subfloor Prep, start to finish

Carpet and pad removal

Old carpet and padding pulled up and hauled out, exposing the subfloor across every room included in the job.

Tack strip and staple removal

Tack strips pried up and staples pulled individually from the subfloor, since leftover staples can puncture new underlayment or vinyl.

Adhesive and residue removal

Old glue, carpet adhesive or vinyl residue scraped and cleaned off the subfloor so the new flooring bonds or sits properly.

Subfloor flatness check

The concrete slab or plywood subfloor is checked for high and low spots using a straightedge, which is what determines where leveling compound is needed.

Self-leveling compound on concrete slabs

Self-leveling compound poured into low areas of the slab and screeded flat, the standard fix for the uneven concrete found in most Orlando homes.

Moisture check

A check for excess moisture in the slab before anything new goes down, since trapped moisture under flooring leads to warping, mold or adhesive failure.

Debris haul-away

Old carpet, pad, tack strips and prep debris hauled off site so the room is clear and ready for the next step.

Flooring Installation

Self-leveling compound and full subfloor prep come standard on every flooring job MS Floors & Cleaning installs in Orlando.

How it works

How our carpet removal & subfloor prep works

01

Walkthrough

MS Floors & Cleaning looks at the current carpet, the rooms involved, and what kind of flooring is going in next so the prep work matches what the new floor will need.

02

Carpet, pad and tack strip removal

Carpet and pad are pulled up, tack strips are pried off, and staples are removed from the subfloor so nothing is left that could damage new flooring or underlayment.

03

Leveling and flatness correction

The exposed subfloor is checked for flatness. On a concrete slab, self-leveling compound is mixed and poured into low spots, then screeded to a flat, even surface and left to cure.

04

Final inspection

Once the compound cures, the subfloor is checked again for flatness and moisture before being handed off as ready for hardwood, vinyl plank, laminate or whatever flooring comes next.

Why Orlando's concrete slabs need this step

Most homes in Orlando, Kissimmee, Clermont and the rest of Central Florida are built slab-on-grade, meaning the first floor sits directly on a poured concrete foundation rather than over a crawl space or basement. That slab was never meant to be perfectly flat, it was meant to support the structure, and small dips, high spots and hairline settling cracks are normal over the life of a house.

Any flooring installed over an unleveled slab inherits every one of those imperfections. Hardwood and laminate planks will rock or gap over a low spot; vinyl plank can telegraph a dip right through the surface. Self-leveling compound is the standard fix: a cement-based liquid poured over the low areas, which settles flat on its own and cures into a hard, even surface the new floor can sit on without flexing.

What gets left behind after carpet comes up

Pulling carpet up is the easy part. What is usually left behind is the tack strip nailed around the room's perimeter, hundreds of staples from the pad, and in older installs, dried adhesive where carpet was glued directly to the slab instead of stretched over pad.

Every one of those has to come out before new flooring goes down. A missed staple can puncture vinyl plank from underneath or tear new underlayment; leftover tack strip is a tripping and injury hazard the moment the carpet is gone. This is detail work done by hand, room by room, not something a quick sweep catches.

Concrete subfloor cleaned and prepared before new flooring goes down
Finished plank flooring installed over a leveled subfloor on an upstairs landing

One team, both jobs

Carpet removal kicks up dust, fibers and debris that settle into every corner of a room. MS Floors & Cleaning's deep cleaning service clears that out, from baseboards to vents, so the space is ready for the next step or ready to live in again.

Deep Cleaning

Carpet Removal & Subfloor Prep: common questions

Yes, carpet removal and subfloor prep can be booked as its own job, which is common for renovations in progress, rental turnovers or homeowners lining up flooring separately.
A visible dip, a floor that feels soft or uneven underfoot, or a straightedge laid across the slab showing gaps are all signs. The walkthrough includes checking the subfloor with a straightedge before recommending leveling work.
Yes. Dried adhesive left on the slab creates an uneven surface and can interfere with how self-leveling compound or new flooring adhesive bonds, so it gets scraped and cleaned off during prep.
Yes. Concrete slabs are leveled with self-leveling compound poured and screeded flat. Plywood subfloors, more common in older homes with a raised foundation, are checked for loose or damaged boards and corrected differently depending on what is found.
Cure time depends on the depth poured and the product used. The schedule for the full job accounts for that cure time so the new flooring is not installed before the subfloor is ready.
No, carpet, pad, tack strips and staples are removed carefully by hand. Any existing subfloor damage found underneath, like a soft spot or cracked slab area, is flagged and addressed as part of the prep rather than ignored.

Ready to talk about your carpet removal & subfloor prep?

Send a few details and we will get back to you with next steps for an estimate.

Call (407) 928-5710